AZ Homework Sign in
Tucson, AZ 85711

5641 E 32nd St

Built 1956 · 1,605 sq ft
Manage Home
Tucson 85711
Claim it to correct details and unlock a free market analysis.

We'll email you a one-time sign-in link.

What's on record

Year built
1956
Living area
1,605 sqft

Major systems

Pool
No
Stories
1.0
Garage
G1

See something wrong above? Report an error

Nearby on this street

What does your home need?

Pick what you need, add your own, and we will line up quotes from local Phoenix pros. No cost, no obligation.

Get quotes from local Phoenix pros

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2024
    permit on file, unconfirmedSolar — Due To The Fact That This Project Is Within A Regulated Floodplain And Requires A Floodplain Use Review (Fup.), We Have Moved This Project Into A Standard 30 Day Review Time Frame. Please Start A New Fup At Our Permit Application Web Page: Https://Tdc-Online.Tucsonaz.Gov/#/Home Note: Documentation Of A Cost Estimate Will Be Required For Solar Installations. The Cost Estimate Must Have A Cost Breakdown, It Must Include Both The Cost Of Materials And The Cost Of Labor, And It May Not Be A Leasing Document. Instructions: 1. Navigate Into The Current Project In The “My Work” Tab. Within The Permit, Navigate To The “Sub-Records” Tab And Click “Apply” On The Floodplain Use Permit Sub-Record 2. Locations -> Confirm The Location Is Accurate To The Project. Click “Next” 3. Type -> Fill In The “Square Feet” And “Valuation” Boxes With The Project Area And A Contractor-Provided Cost Estimate (See Note Above: For New Structures, Input 0). Click “Next” 4. Contacts -> Confirm Contacts And Add Any Additional Contacts If Applicable. Click “Next” 5. More Info -> This Will Be Filled In By The Engineer Assigned To Your Case, Click “Next” 6. Attachments -> Please Attach The Project Plan, Supporting Documentation For The Cost Estimate (If Applicable), And A Drainage/Hydrology Report (If Applicable). Click “Next” 7. Signature -> Read The Statement And Type Your Name. Sign Your Name Below (You May Enable Type Signature To Have The Software Sign For You.) Click “Next” 8. Review And Submit -> Review All Information To Ensure Accuracy. Click “Submit” Contact Michael Ortiz At Michael.Ortiz@Tucsonaz.Gov If You Have Any Questions About The Fup. Solarapp - Installation Of 9.20Kw Pv System
  • 2022
    permit on file, unconfirmedPlumbing — Reroute Private Plumbing
  • 2020
    permit on file, unconfirmedElectrical — Panel Upgrade
  • 2020
    permit on file, unconfirmedElectrical — Panel Upgrade To 200Amp
  • 2020
    permit on fileHeating & cooling — 4 Ton 14 Seer Gas Split Like For Like

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet · 11% of homes built in 1956 we track have one on record (1020 of 9172)
HVACOn record
Permit on file · 2020 · 12% of homes built in 1956 we track have one on record (1067 of 9172)
Water heaterUnknown
Not found in our records yet
ElectricalUnknown
Not found in our records yet · 8% of homes built in 1956 we track have one on record (739 of 9172)
KitchenUnknown
Not found in our records yet · 14% of homes built in 1956 we track have one on record (1317 of 9172)
BathroomsUnknown
Not found in our records yet · 14% of homes built in 1956 we track have one on record (1300 of 9172)

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.