AZ Homework Sign in
Tucson, AZ 85706

4348 E Mesquite Desert Tr

Built 2005 · 1,561 sq ft
Manage Home
Tucson 85706
Claim it to correct details and unlock a free market analysis.

We'll email you a one-time sign-in link.

What's on record

Year built
2005
Living area
1,561 sqft

Major systems

Pool
No
Stories
1.0
Garage
G2

See something wrong above? Report an error

Nearby on this street

What does your home need?

Pick what you need, add your own, and we will line up quotes from local Phoenix pros. No cost, no obligation.

Get quotes from local Phoenix pros

Sending your list saves it to this home and starts your record. You can manage it anytime.

Upgrade & maintenance timeline

  • 2025
    permit on fileSolar — Due To The Fact That This Project May Be Within A Regulated Floodplain And Requires A Floodplain Use Review (Fup.), We Have Moved This Project Into A Standard 30 Day Review Time Frame. Please Start A New Fup At Our Permit Application Web Page: Https://Tdc-Online.Tucsonaz.Gov/#/Home Note: Documentation Of A Cost Estimate Will Be Required For Solar Installations. The Cost Estimate Must Have A Cost Breakdown, It Must Include Both The Cost Of Materials And The Cost Of Labor, And It May Not Be A Leasing Document. Instructions: 1. Navigate Into The Current Project In The “My Work” Tab. Within The Permit, Navigate To The “Sub-Records” Tab And Click “Apply” On The Floodplain Use Permit Sub-Record 2. Locations -> Confirm The Location Is Accurate To The Project. Click “Next” 3. Type -> Fill In The “Square Feet” And “Valuation” Boxes With The Project Area And A Contractor-Provided Cost Estimate (See Note Above: For New Structures, Input 0). Click “Next” 4. Contacts -> Confirm Contacts And Add Any Additional Contacts If Applicable. Click “Next” 5. More Info -> This Will Be Filled In By The Engineer Assigned To Your Case, Click “Next” 6. Attachments -> Please Attach The Project Plan, Supporting Documentation For The Cost Estimate (If Applicable), And A Drainage/Hydrology Report (If Applicable). Click “Next” 7. Signature -> Read The Statement And Type Your Name. Sign Your Name Below (You May Enable Type Signature To Have The Software Sign For You.) Click “Next” 8. Review And Submit -> Review All Information To Ensure Accuracy. Click “Submit” Contact Michael Ortiz At Michael.Ortiz@Tucsonaz.Gov If You Have Any Questions About The Fup. 3.28 Kw Dc System- Roof Mount Pv W/ Storage , Derate 175A, Existing System
  • 2020
    permit on file, unconfirmedSolar — Installation Of Rooftop 5.12Kw Dc Photovoltaic Solar System

Manage this home to schedule a service or to update the timeline.

Systems and their update history

RoofUnknown
Not found in our records yet · 2% of homes built in 2005 we track have one on record (1062 of 70202)
HVACUnknown
Not found in our records yet · 6% of homes built in 2005 we track have one on record (4451 of 70202)
Water heaterUnknown
Not found in our records yet
ElectricalUnknown
Not found in our records yet · 1% of homes built in 2005 we track have one on record (505 of 70202)
KitchenUnknown
Not found in our records yet · 8% of homes built in 2005 we track have one on record (5688 of 70202)
BathroomsUnknown
Not found in our records yet · 6% of homes built in 2005 we track have one on record (4058 of 70202)

“Unknown” means we haven't matched a record for it yet — not that it hasn't happened. Own this home? Claim it to fill in what we're missing.